A significant volume of work exists regarding the preparation of an approved subcontractor list (D&B analysis, availability of manpower, etc.), formulation of trade contracts, insurance requirements of CM and subcontractors, establishment of construction budget and bid procedures, design drawings distribution, shop drawing approval/routing/control, vertical transportation logistics, Building Department filing/inspections and other critical project details. All of these procedures and issues will be resolved during the pre-construction phase of the project.